How the Inspection Process Works

The metal racking inspection process is structured in 6 phases to ensure maximum safety and regulatory compliance.

PHASE 1

Initial Phone Contact

The first step is the phone contact during which we:

  • Gather preliminary information about your racking systems
  • Assess the specific needs of your facility
  • Schedule the first on-site survey
  • Provide general information about the service
PHASE 2

Initial On-Site Survey

Our certified technicians perform an on-site survey to:

  • Visually examine the condition of the racking
  • Measure dimensions and characteristics of the system
  • Identify any immediate critical issues
  • Photograph the current situation
  • Collect technical data for the quote
PHASE 3

Detailed Quote

Based on the survey, we prepare a detailed quote that includes:

  • Number of racking systems to inspect
  • Estimated time for complete inspection
  • Inspection service costs
  • Any need for corrective interventions
  • Expected execution timeframes
The quote is free and without obligation.
PHASE 4

First Inspection Visit

Once the quote is approved, we proceed with the in-depth inspection:

  • Geometry check: Verify compliance with original design
  • Verticality: Check alignment of frames longitudinally and transversely
  • Anchors: Verify floor fixing via anchors
  • Safety catches: Check application and functionality
  • Load capacity plates: Verify presence and correct completion
  • Structural integrity: Check uprights, beams and components
  • Damage classification: Traffic light system Green/Amber/Red
  • Photo documentation: Complete reporting with images
Regulatory Compliance

The inspection complies with standards UNI EN 15629:2009 and UNI EN 15635:2009.

PHASE 5

Inspection Report Preparation

At the end of the inspection, we prepare a complete inspection report that includes:

Inspection Sheet
  • List of non-conformities
  • Classification by severity level
  • Racking identification
Photo Attachments
  • Photos of damaged racking
  • Details of detected issues
  • Complete visual documentation
Risk Analysis
  • Risk level assessment
  • Intervention priorities
  • Specific recommendations
Joint Signature
  • Inspector's signature
  • Client's signature
  • Official document validation
The report constitutes an official document to be kept to demonstrate compliance with legal obligations under Legislative Decree 81/2008.
PHASE 6

Subsequent Periodic Inspections

After one year from the first inspection, the client is contacted to schedule subsequent periodic inspections:

  • Automatic reminder after 12 months
  • Scheduling of new inspection date
  • Verification of effectiveness of any corrective actions taken
  • Inspection report update
  • Maintenance of regulatory compliance over time
Periodic inspections are mandatory to ensure continuous safety of racking systems throughout their entire life cycle, as required by UNI EN 15635:2009.

Why Choose Our Service

Certified Technicians

Qualified personnel constantly updated on regulations

30+ Years Experience

Since 1989 in metal racking and warehouse safety sector

Regulatory Compliance

Inspections according to UNI EN 15629:2009 and UNI EN 15635:2009

Fast Response

Quick intervention and efficient inspection organization