Help Center
Everything you need to know about Metal Racking Inspection Checks
Useful Links
Contact Us
Have questions? Contact us to receive general information about our services.
Go to ContactsRegulations
Consult the UNI EN 15629 and 15635 regulatory framework for metal racking.
Read RegulationsHow the Inspection Process Works
The metal racking inspection process is structured in 6 phases to ensure maximum safety and regulatory compliance.
Initial Phone Contact
The first step is the phone contact during which we:
- Gather preliminary information about your racking systems
- Assess the specific needs of your facility
- Schedule the first on-site survey
- Provide general information about the service
Initial On-Site Survey
Our certified technicians perform an on-site survey to:
- Visually examine the condition of the racking
- Measure dimensions and characteristics of the system
- Identify any immediate critical issues
- Photograph the current situation
- Collect technical data for the quote
Detailed Quote
Based on the survey, we prepare a detailed quote that includes:
- Number of racking systems to inspect
- Estimated time for complete inspection
- Inspection service costs
- Any need for corrective interventions
- Expected execution timeframes
First Inspection Visit
Once the quote is approved, we proceed with the in-depth inspection:
- Geometry check: Verify compliance with original design
- Verticality: Check alignment of frames longitudinally and transversely
- Anchors: Verify floor fixing via anchors
- Safety catches: Check application and functionality
- Load capacity plates: Verify presence and correct completion
- Structural integrity: Check uprights, beams and components
- Damage classification: Traffic light system Green/Amber/Red
- Photo documentation: Complete reporting with images
Regulatory Compliance
The inspection complies with standards UNI EN 15629:2009 and UNI EN 15635:2009.
Inspection Report Preparation
At the end of the inspection, we prepare a complete inspection report that includes:
Inspection Sheet
- List of non-conformities
- Classification by severity level
- Racking identification
Photo Attachments
- Photos of damaged racking
- Details of detected issues
- Complete visual documentation
Risk Analysis
- Risk level assessment
- Intervention priorities
- Specific recommendations
Joint Signature
- Inspector's signature
- Client's signature
- Official document validation
Subsequent Periodic Inspections
After one year from the first inspection, the client is contacted to schedule subsequent periodic inspections:
- Automatic reminder after 12 months
- Scheduling of new inspection date
- Verification of effectiveness of any corrective actions taken
- Inspection report update
- Maintenance of regulatory compliance over time
Why Choose Our Service
Certified Technicians
Qualified personnel constantly updated on regulations
30+ Years Experience
Since 1989 in metal racking and warehouse safety sector
Regulatory Compliance
Inspections according to UNI EN 15629:2009 and UNI EN 15635:2009
Fast Response
Quick intervention and efficient inspection organization